Co-generation plant for waste treatment at a plywood factory – HOLLAND

In the Netherlands, in Hoozegand, we worked on a gasifier project for an optimization and waste re-use process (wood and paper).

After carrying out the dimensioning, construction and installation studies following Dutch standards, our engineers steered the manufacture and installation of electrical equipment on our client’s site (5,000 hours of Electrical Works)

They took the process through the commissioning phase as well as conducting the start-up for this plant.

The Key Elements

  • Electrical studies following Dutch standard NEN 1010-Part6
  • Provided MCC & PLC cabinets
  • Electrical works procurement