We successfully designed, programmed and implemented the energy management system of two twin FPSO located on block 32 in Angola.
This project came with several challenges :
- Technical (Integrated optical network – 1 simple PLC – 4 communication PLCs)
- Management of 4,500 study hours and an 8-month completion deadline
- Logistics with interventions in Norway, Singapore and Angola
The Key Elements :
- Load Shedding 14 ms
- Fast Track Project (36 months)
- 700 cabled I/O
- 800 network I/O
- 12,000 database points