In Saudi Arabia our automation engineers installed PLC, IHM and SCADA in two Green Anode Paste Plants (GAP) at an aluminum factory.
After developing the automation and the installation process over a period of 1 year, we proceeded to the necessary tests and conducted the entire commissioning phase.
Our scope of work also included operational technical assistance.
The key Elements :
- PLC, IHM and SCADA development
- 2 000 I/O