We worked on the Incineration of houshold waste process during the plant shutdown. This time was used to modernise the Integrated Waste Treatment Centre CITD for Semardel in Vert le Grand.
A heat exchanger was installed on each of the plant’s two incineration lines in order to improve energy performance: a gas/water exchanger was added downstream of the exhaust fan just before the stack at the plant exit. In this context, a skid consisting of pumps and valves was also installed.
Our scope of work included :
- Electrical Studies
- Automation Studies
- Cabinets Manufacturing
- Installation
- Commissioning Assistance
We thank Hitachi for its trust
The key Elements :
- Integration and programming of energy calculators ENDRESS HAUSER
- Development of a SIMATIC COMFORT Touch Panel SIEMENS
- Regulation and control loops for pumps and 3-way valve