We replaced the control-command system of the Olympe ski-lift garage linking Brides-les-Bains with Méribel.
Through close collaboration with our client, we were able to better understand their needs and implement their desired improvements (new ergonomy, elimination of the synoptic view) while optimising the initial operations.
The Key Elements :
- Revamping and retro-engineering of the PLC and electrical systms
- Process simulation
- Interface with the existing ski-lift
#IESAAutomation #Automation #Electricity #SkiLift #Ropeways #Revamping #RetroEngineering #ControlCommandCabinet #AutomationStudies #ElectricityStudies