Within the framework of sewers construction for Doha in Qatar, our experts intervened in programming of a bridge crane.
Our scope of works included :
- Restriction area programming
- Cycle times optimisation
- Exchange between surface and downhole operators
- Bridges simulation to test without disrupting production
- Installation of 4G remote control routers
- Commissioning in Doha, Qatar
A sucessfully challenge : all modifications were made without stopping production
The Key Elements :
- Quick integration into customer teams
- Cycle times optimisation
- Continuity of production during tests and modifications
- Configuration and installation of 4G Ubiquity routers
- Plug’n Test
#IESAAutomation #TBM #TunnelBoringMachines #Tunneliers #PlugNTest #SimulationProcess #Simulation3D #RéalitéVirtuelle #VirtualReality #Emulators #IndustrialEmulators #HydrauliqueSimulation #TunnelSegmentErector #PontAlimentationVoussoirs #Routeurs4GUbiquity #ConstructionDesEgouts #SegmentSupplyBridge #SewersConstruction