Our electrical and automation experts intervened on Flue Gas Treatment for a Waste-to-Energy Processing Plant in Schweighouse sur Moder. This plant is a ISO 14001-certified incineration unit, with energy recovery (steam, hot water and electricity).
Our teams designed the PLC program, the electrical installation and the commissioning of the fume treatment system including 2 lines and the common PLC.
To succeed, our scope of intervention contained various points both in electricity and automation.
Automation :
- Drafting the functional analysis
- PLCs programming
- Network architecture diagram
- Out-of-production testing (700 I/O)
- Tests in production
- Supervision updating
- Commissioning of 3 PLCs (Siemens S7-300)
- Commissioning, maintenance and installation user manuals
Electricity and Instrumentation :
- Calculation notes: LV cable, heat dissipation,
- Studies of electrical rooms layout
- Lighting
- Detailed schemes of PLCs cabinets
- Electrical cabinets manufacturing
- Electrical works of 3650H
The Key Elements :
- Functional analysis
- 700 inputs/outputs
- PLCs Siemens S7-300
- Electrical works of 3650H
- Short period for I/O tests and commissioning (1 month)
- Electrical cabinets manufacturing
#IESAAutomation #Automatisme #Automation #ElectricitéIndustrielle #IndustrialElectricity #AutomateS7-300 #Siemens #CâblesBT #ArmoiresElectriques #Commissioning #AnalyseFonctionnelle #ShématiqueArmoireAutomates #NotesDeCalculs #MiseEnService #Industrie #CentreValorisationOrduresMénagères #UnitéIncinération #WasteRecoveryCenter #IncinerationUnit #Industry #Environnement #Environment #ElectricalCabinet #FunctionalAnalysis #SchematicAutomatedCabinet