In Colmar, we revamped the power and control system for a waste incineration plant.
We worked for nearly four months to install the electrical facilities for the process.
Our close coordination with the other tradesmen allowed recommissioning within a week.
The key Elements :
- Power system revamping
- Upgraded the control system for 2 emission treatment lines
- Upgrade Schneider
#IESAAutomation #ElectricityAndInstrumentation #Environment #Revamping #ControlSystem #UpgradeSchneider #EmissionsTreatment #WasteIncineration #WasteTreatment