We carried out the design « Automation and Electricty » in a wastewater treatment in Algeria.
The conception and realization part of the electrical package included the supply of High Voltage cells (30 kV) and 2 transformers (2×800 kVA).
We realized the electrical works procurement of this installation (4 000 hours).
We performed the commissioning phase and provided technical assistance for the operators.
The Key Elements :
- Electrical Works Procurement
- HV Substation 30 kV
- Transfomers 2×800 kVA
- Main Low voltage Board and MCC Cabinets
- 2 PC of supervision